Use this checklist to prepare for an inspection. It does not mean that every home in the area has the same construction or termite condition.
Track what changed after the original build
Pretreatment belongs to a moment in the construction timeline. Later patios, shade structures, utility runs, planters, landscape walls, or soil changes may create new access and documentation questions.
Compare the current exterior with closing or construction records if available. Mark the location of additions and tell the inspector which contractor performed the work. Do not assume the original termite agreement automatically includes later construction.
What to have ready for the inspection
Before the visit, collect available pretreatment, warranty, inspection, repair, purchase, and addition records. Photograph the suspected sign and identify the nearest room, exterior wall, utility, patio, or landscape feature.
Give the inspector access to the relevant interior and exterior edges without moving fixed materials yourself. Identify leaks, irrigation, recent grading, attached concrete, storage, or remodeling that may affect visibility.
- Original pretreatment record
- Map of later patios or structures
- Utility and trench work dates
- Foundation visibility check
- Current warranty contact
What to ask after the inspection
Ask what evidence was confirmed, which areas could not be inspected, what treatment is recommended, and what written records you will receive.
If the home was treated before, check the original paperwork and contact the company named in it before paying for another treatment. If you need a WDIIR for a real-estate transaction, say so when scheduling.